Instelligence

Authorised Proxmox Partner · Australia

Move off VMware.
Own your infrastructure
again.

Instelligence designs, deploys, and supports Proxmox VE private clouds for Australian SMEs, MSPs, and cloud providers — senior engineers, no offshore hand-offs.

New

Proxmox VE 9.2 is out.

  • Dynamic CRS load balancing
  • Disarmable HA for maintenance
  • WireGuard & BGP SDN fabrics
  • Ceph Tentacle default
Read the breakdown
Authorised Proxmox VE partner Proxmox Backup Server licensed reseller Proxmox Mail Gateway support Ceph storage design Australian businesses only

The situation

Broadcom changed the deal.
You need an exit.

VMware's acquisition by Broadcom ended perpetual licensing, killed the VCSP program, and pushed per-core subscription pricing that has tripled costs for many Australian organisations. The window to plan an orderly migration — not a panicked one — is now.

Proxmox VE is the leading alternative built by a vendor that still treats customers as the reason they exist: KVM + LXC, enterprise-grade HA and live migration, built-in backup via PBS, and no per-VM or per-core licensing tax. We've been deploying it since before the Broadcom acquisition made it a household name.

⚠️

VCF per-core licensing

Broadcom's VMware Cloud Foundation charges per physical core — a 4-host cluster with 32 cores each can cost A$230k+ in Year 1 licensing alone.

Proxmox socket-based pricing

Proxmox VE is licensed per socket. Add cores, add VMs — the licensing bill barely moves. A comparable cluster runs under A$12k/yr.

The math is obvious

Three-year TCO savings of A$150k–250k are common for mid-size clusters. Use our calculator with your actual numbers.

Free tool · no sign-up

Proxmox VE vs VMware Cloud Foundation cost calculator

Plug in your host count, core count, and contract term. See what Broadcom's per-core licensing is actually costing you — and what Proxmox would cost instead.

Open the calculator

Example: 4 hosts · 2 sockets · 16 cores each

VMware VCF (3yr)

A$275k

US$172k at 1.60

Proxmox VE (3yr)

A$39k

3-year saving A$236k

Indicative only — run the calculator with your own numbers.

Case study

One MSP. A$448k/yr saved. Zero customer outages.

A 40-host VMware cluster moved to Proxmox VE — 400+ VMs migrated in scheduled batches, a new multi-tenant Proxmox cloud tier launched within 90 days, and infrastructure costs reduced by 65%. None of the MSP's customers noticed the platform change.

40

VMware hosts migrated

400+

virtual machines moved

A$448k

annual VMware spend eliminated

65%

total infrastructure cost reduction

What clients say

Trusted by Australian tech leaders

"Instelligence delivered a seamless migration from our legacy VMware environment to Proxmox. Their team's deep technical expertise and straightforward communication made what could have been a complex project feel manageable. We've cut our virtualisation costs significantly and have a platform we actually understand and control."
AM

Adrian Mazzocchetti

CEO, Cloud Servers Australia

"We engaged Instelligence to help us evaluate our options after Broadcom's VMware changes hit us. They gave us honest, vendor-neutral advice — not a sales pitch. Their assessment was thorough, their recommendations were practical, and they delivered everything on time. I'd recommend them to any MSP navigating the same situation."
TH

Tony Heywood

Managing Director, Prodo Technology

"Stell's knowledge of the private cloud space is genuinely exceptional. The depth of understanding he brings to infrastructure design — from cluster architecture through to storage and networking — is rare. He has a sharp eye for what actually works in production, not just what looks good on a whiteboard. MultiPortal is a better product because of the insights and direction Stell has contributed."
BT

Ben Town

CTO & Founder, MultiPortal

Ready to start?

Talk to an engineer, not a sales rep.

Discovery calls are free and run by the engineers who'll do the work. We'll tell you honestly whether Proxmox is the right fit, what migration will actually involve, and what it'll cost.